
HIGH HAZARD RISK ANALYSIS
HAZARD IDENTIFICATION
&
RISK ANALYSIS
Through our Principal Designer services in high hazard construction projects we have developed a scope of services to help construction and engineering teams identify, evaluate, and manage potential risks before they become costly or hazardous issues. Our structured approach to hazard studies ensures safer projects, smoother operations, and compliance with industry best practices.
Our services.
-
HAZID (Hazard Identification)
We can undertake systematic HAZID workshops at the early stages of a project to identify potential hazards in design, construction, and operation. This proactive assessment allows risks to be managed before they impact safety, cost, or schedule.
-
HAZCON (Hazard in Construction)
Focused on the construction phase, our HAZCON reviews highlight risks associated with worksite activities, contractor interfaces, and construction methodologies. We help ensure that all stakeholders understand and mitigate risks during execution.
-
HAZDEM (Hazard in Design, Engineering & Maintenance)
Our HAZDEM studies provide a structured evaluation of hazards that may arise throughout the design, engineering, and maintenance lifecycle. This ensures that operational safety and maintainability are considered from the outset, reducing long-term risks and costs.
-
HAZOP (Hazard & Operability Study)
We facilitate detailed HAZOP reviews of process systems, engineering designs, and operational procedures. Using a guideword-driven methodology, our team works with stakeholders to identify deviations, assess consequences, and recommend practical safeguards.